Infunde Development

Pre-Feasibility Report – Concentrated Solar Power Plant Development Near Kupang, Indonesia

In 2017, we conducted a detailed geographic/resource analysis of the
feasibility of a concentrated solar power (CSP) plant, located near Kupang,
Indonesia, at the request of Infunde Development Pte. Ltd. The work was
organized into 3 (inter-dependent) aspects: Data and resource analysis, a plant
design and parametric study, and an economic analysis.